Behind the Scenes: The Desk Where Version 3 Shipped
A single photo of launch night, plus the notes we wrote on the sticky pad next to it.
After every release we hold a short, blame-free review. The notes go into the next checklist, which is why the list keeps getting longer and launches keep getting quieter.
Photo from the Launch Crate studio: behind the scenes.
We split every launch into three windows: the week before, launch day and the week after. Each window has a named owner, a checklist and a clear definition of done.
What we would change
The most useful habit we picked up was a written rollback plan. It is rarely needed, but knowing it exists makes the whole team calmer and faster.